Category Archives: Utility
Endverschluss beschädigt, aber VLF-Prüfung bestanden
By: Ben Lanz and Bill Corrente
Posted in: Workmanship, Wind, Utility, Renewable, Generation, Facility, Cable
Endverschluss beschädigt, aber VLF-Prüfung bestanden Nachdem ein Energieversorger mehrere Endverschlussdefekte hatte, erteilte er uns den Auftrag für die Inbetriebnahme von Kabelsystemen bei einem neuen Kraftwerk. Zuvor hatt... Read ArticlePD Activity Identified During Assessment of Aged Utility Cable
By: IMCORP
During the reliability assessment of aged underground residential distribution (URD) cable systems at a mid-western electric utility, one particular cable sample was found to exhibit low levels partial discharge (PD) activity. These PD sites were evi... Read ArticleVery Low Partial Discharge Values Found While Commissioning A New Wind Farm
By: IMCORP
Posted in: Workmanship, Wind, Utility, Renewable, Cable
During a recent wind farm commissioning project in the southern United States multiple defects were identified within the collector cable system. One particular cable exhibited defects in the form of very low levels of partial discharge at two times ... Read ArticleMisplaced Stress Relief Material at a Utility
By: IMCORP
Posted in: Workmanship, Utility
This particular open-air termination transitions an underground line to a riser. Although visual inspection indicated that the cable was properly installed (it is difficult to see the mastic placement with the termination installed), the cable ... Read Article